30,733,043 SHARES ISSUED                                                                                                         

 

MILLSTREAM ADVANCES TO PROTOTYPE METAL

RECOVERY PROGRAM AT POTTER MINE PROPERTY
 
Date: Oct. 22, 2001
 

Millstream Mines Ltd. announced today that it is preparing a pre-feasibility and design study for the construction of a prototype processing plant capable of treating 100 plus tons per day of its Potter Mines' tailings materials (waste dump). This step forward has been prompted by the encouraging results of testing on the possibility of extracting some of the metals (copper, zinc, cobalt, and magnesium) contained in the tailings produced during the operation of the Potter Mine. The Potter Mine property is located in Munro Township, Matheson area, northeast Ontario, Canada.

 

The plant will be built in a modular format that will allow for an orderly expansion of processing capabilities. Previous drilling, sampling and assaying of the tailings confirmed a calculated average grade of 3.5% magnesium, 0.2% copper, 1.5% zinc and 0.05% cobalt contained within 480,000 tons of tailings (P.R. February 7 and June 22,2000). Based on current market prices for magnesium at US$1.80/lb, copper at US$0.65/lb, zinc at US$0.40/lb and cobalt at US$12.25/lb the in-situ metal value equates to CDN$114,454,000 using a 1.56 CDN/US$ conversion factor.

 

The In-Situ Pilot Test Program (P.R. April 3 and June 28, 2001) in conjunction with Simulated In-Situ tests have confirmed the Electro-Chemical Quik Leach and proprietary Membrane technologies are an applicable process in achieving viable commercial production levels of metal recovery.

 

The Electro-Chemical Quik Leach technology (patented) owned by Enpar Technologies of Guelph, Ontario, enhances the leaching rate of sulphide materials and the Membrane (proprietary) technology concentrates the leached metal ions enriching the leached solution (pregnant solution).

 

Millstream, further wishes to announce and remind the interested public of its web site location, WWW.MILLSTREAMMINES.COM, which also contains the above referenced press releases.

 

The principle objective of Millstream Mines Ltd. is to enhance and develop known mineral properties to production potential.

 

-30-

For further information contact:

 

Mr. Ernest Harrison, EM, CEO     Phone: 705-474-7282

Mr. Marty Martinello, B.A., V.P.   Fax: 705-474-5491

 

Mr. Robert Chase, B.A.  Phone:   416-368-9595

                         Fax:     416-368-0584

                         Email: mlsm@passport.ca

 

 

 

No regulatory authority or similar body approved nor disapproved the information contained herein.