Assays and Hole Locations
|
Hole S97-O8A (15.50W, 100 S, AZ 180 deg., 60 deg dip) Cross Section and Plan View |
||||||
|
Interval Metres |
Core Length (m) (ft.) |
Copper (%) |
Zinc (%) |
Cobalt (%) |
Silver (oz/t) |
Gold (oz/t) |
|
482.4 – 485.0 |
2.6 / 8.53 |
2.46 |
1.88 |
NA |
.750 |
NA |
|
488.4 – 494.9 |
6.9 / 22.57 |
1.52 |
3.98 |
NA |
.640 |
NA |
|
502.6 - 506.2 |
3.6 / 11.8 |
3.74 |
2.49 |
NA |
1.11 |
NA |
|
TOTAL - |
13.1 / 43.0 |
2.32 |
3.14 |
NA |
.790 |
NA |
|
|
|
(avg) |
(avg) |
|
(avg) |
|
|
537.4 – 543.7 |
6.3 / 20.9 |
0.27 |
0.65 |
|
0.12 |
|
|
included in the assays noted above were the following high – grade sections: |
||||||
|
482.4 –483.9 |
1.5 / 4.92 |
3.62 |
3.19 |
0.136 |
.86 |
.005 |
|
491.86 –494.4 |
2.54 / 8.33 |
2.33 |
9.09 |
0.073 |
1.08 |
.001 |
|
504.2 –506.2 |
2.0 / 6.56 |
6.60 |
4.37 |
0.082 |
1.91 |
.022 |
|
489.00-494.4 |
5.40 / 17.7 |
1.72 |
4.93 |
0.073 |
0.73 |
|
|
Hole S97-09 (16.10W, 630S, Az 350 deg, 60 deg dip) collared 230 feet west on strike from the preliminary discovery hole S97-08A. Cross Section and Plan View |
||||||
|
604.6 – 627.5 |
22.9 / 75.13 |
2.65 |
2.70 |
0.083 |
0.76 |
|
|
included in the assays noted above are the following high – grade intervals: |
||||||
|
613.6 - 623.0 |
9.4 / 30.84 |
3.86 |
4.57 |
0.128 |
1.126 |
.023 |
|
618.6 – 623.0 |
4.4 / 14.44 |
3.80 |
7.02 |
0.133 |
1.153 |
.034 |
|
Values ranged up to 12.12 % Zn and 7.55 % Cu. |
||||||
|
Hole S98-01 (17.25W.675S.Az 355 deg.dip-60 deg) drilled 50 metres (164 ft.) west from hole S97-10.Cross Section and Plan View |
||||||
|
695.15-702.9 |
7.75 / 25.4 |
5.34 |
3.24 |
0.067 |
1.16 |
NA |
|
Incl. |
||||||
|
695.15 - 700.4 |
5.25 / 17.2 |
7.81 |
4.76 |
0.096 |
1.69 |
NA |
|
773.50-776.5 |
3.00 / 9.8 |
2.17 |
3.90 |
0.047 |
0.46 |
NA |
|
774.35-776.5 |
2.15 / 7.1 |
2.95 |
5.42 |
0.053 |
0.61 |
NA |
|
Hole S98-05 (15+85W, 575S, Az 350, dip-60) was targeted to test the continuity of the mineralized Cu-Zn-Co system to 200+ feet west of the massive sulphides of previously drilled hole #S97-08A.Cross Section and Plan View |
||||||
|
420.12-423.75 |
3.63 / 11.9 |
2.69 |
0.29 |
0.079 |
0.49 |
NA |
|
507.40-519.70 |
12.3 / 40.4 |
1.53 |
2.05 |
0.131 |
0.42 |
NA |
|
Incl. |
||||||
|
513.00-519.70 |
6.70 / 22.0 |
2.14 |
2.47 |
0.174 |
0.58 |
NA |
|
515.00-519.70 |
4.70 / 15.4 |
2.54 |
3.38 |
0.168 |
0.70 |
NA |
|
516.00-519.70 |
3.70 / 12.1 |
2.75 |
3.74 |
0.165 |
0.73 |
NA |
|
Hole S98-06 (16+30W, 630S, Az350, dip-60) was targeted to test the continuity of the mineralized Cu-Zn-Co system midway (strike and depth) between the MASU intervals of holes S97-09 and S98-01 previously drilled. Cross Section and Plan View |
||||||
|
653.90 - 680.66 |
26.76 / 87.80 |
2.57 |
1.68 |
0.082 |
0.61 |
NA |
|
Incl. |
||||||
|
653.96 - 665.50 |
11.60 / 38.06 |
4.34 |
2.18 |
0.122 |
0.94 |
NA |
|
653.90 - 663.49 |
9.59 / 31.46 |
5.01 |
2.63 |
0.131 |
1.09 |
NA |
|
2nd. Interval |
||||||
|
696.62 - 705.30 |
8.68 / 28.48 |
3.39 |
0.80 |
0.071 |
0.67 |
NA |
|
Incl. |
||||||
|
696.62 - 703.00 |
6.38 / 20.93 |
4.46 |
1.06 |
0.094 |
0.89 |
NA |
|
Hole S99-01A |
Hole S99-01A (17+60W, 975S, Az345, dip-60) was targeted to test the downward continuity of the Cu-Zn-Co sulphide mineralized mine horizon at 1000 ft. below the previously drilled massive sulphide (MASU) intersections. Cross Section and Plan View |
|||||
|
1171.9 -1179.72 |
7.82 / 25.66 |
1.96 |
3.18 |
0.085 |
0.53 |
NA |
|
Incl. |
||||||
|
1171.9 - 1176.40 |
4.50 / 14.76 |
1.98 |
4.55 |
0.098 |
0.61 |
NA |
|
1171.9 - 1175.2 |
3.30 / 10.83 |
2.19 |
5.96 |
0.116 |
0.71 |
NA |
|
3rd Interval |
||||||
|
1165.2 - 1166.2 |
1.00 / 3.28 |
1.26 |
1.18 |
0.036 |
0.29 |
NA |
|
2nd Interval |
||||||
|
1161.0 - 1162.0 |
1.00 / 3.28 |
1.71 |
0.46 |
0.037 |
0.34 |
NA |
|
1st Interval |
||||||
|
1158.4 - 1159.95 |
1.55 / 5.09 |
2.11 |
1.40 |
0.093 |
0.50 |
NA |
|
[highest single assay: Cu@4.13%, Zn@7.78%, Co@0.160%,] |
||||||
|
Hole S99-05 |
Hole S99-05 (branch wedged to the east off hole S99-03) was targeted to test the West extension of the Cu-Zn-Co MASU intersection of hole S99-01A between holes S99-01A and S99-03 at a 50 meter (164ft.) horizontal step-out from S99-01A. |
|||||
|
1172.39 - 1176.8 |
4.41 / 14.47 |
1.34 |
1.57 |
0.065 |
NA |
NA |
|
Incl. |
||||||
|
1172.39 - 1175.0 |
2.61 / 8.56 |
1.58 |
1.94 |
0.043 |
NA |
NA |
|
[highest single assay: Cu@3.06%, Zn@2.90%, Co@0.065%,] |
||||||
SUMMARY OF MASU ORE INTERVALS IN DRILL HOLES PROGRESSING WEST
|
Drill Hole (#) . |
MASU Interval Meters |
Core Length (M) (Ft) |
Cu (%) |
Zn (%) |
Co (%) |
Ag (oz/t) |
|
S97-08A |
489.00-494.40 |
5.40 / 17.70 |
1.72 |
4.93 |
0.073 |
0.73 |
|
S98-05 |
507.40-519.70 |
12.30/40.36 |
1.53 |
2.05 |
0.131 |
0.42 |
|
S97-09 |
604.60-627.50 |
22.90 / 75.13 |
2.65 |
2.70 |
0.083 |
0.76 |
|
S98-06 |
653.90-680.66 |
26.76 / 87.80 |
2.57 |
1.68 |
0.082 |
0.61 |
|
S98-01 |
695.15-702.90 |
7.75 / 25.40 |
5.34 |
3.24 |
0.067 |
1.16 |
|
S99-01A |
1171.9 -1179.72 |
7.82 / 25.66 |
1.96 |
3.18 |
0.085 |
0.53 |
GOLD ASSAYS NOT INCLUDED
SUMMARY: Vertical depth of ore zone intersections
|
Drill Hole (#) |
Ore Interval Core Length (M) (Ft.) |
Vertical Depth ( 2)(M) (Ft.) |
|
S97-08A |
5.40 / 17.70 |
425.8 / 1397.2 |
|
S97-05 |
12.30 / 40.36 |
444.7 / 1459.2 |
|
S97-09 |
22.90 / 75.13 |
533.5 / 1750.4 |
|
S98-06 |
26.76 / 87.80 |
578.1 / 1896.1 |
|
S98-01 |
7.75 / 25.40 |
605.4 / 1986.2 |
|
S99-01A |
7.82 / 25.66 |
914.0 / 2998.8 |
|
|
82.93 / 272.05 |
|
2. Vertical depth from surface to the mid pierce point of the ore zone intersection.
Other Hole Locations
Hole S97-10
Cross Section and Plan ViewHole S97-11
Cross Section and Plan ViewHole S97-12
Cross Section and Plan ViewHole S98-02, S98-03
Cross Section and Plan ViewHole S98-04
Cross Section and Plan View* Last updated on Aug 19, 1999
.*